{"id":2835,"date":"2020-07-13T17:15:01","date_gmt":"2020-07-14T03:15:01","guid":{"rendered":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals-public-notices\/public-notices-state-legals-public-notices\/0001287136-01\/"},"modified":"2020-07-13T17:15:01","modified_gmt":"2020-07-14T03:15:01","slug":"0001287136-01","status":"publish","type":"post","link":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/","title":{"rendered":"0001287136-01"},"content":{"rendered":"<p align=\"center\">\n<font face=\"FranklinGothic-MedCnd\" size=\"2\" color=\"#000000\"><b>REQUEST FOR PUBLIC COMMENTS<br \/>\nON DRAFT AIR PERMITS<br \/>\nREGULATING THE EMISSIONS OF AIR POLLUTANTS<\/p>\n<p>(Docket No. 20-CA-PA-06)<\/p>\n<p><\/b><\/font><\/p>\n<p><font size=\"2\" color=\"#000000\">Pursuant to Hawaii Revised Statutes (HRS), Chapter 342B-13, and Hawaii Administrative Rules (HAR), Chapter 11-60.1, the Department of Health, State of Hawaii (DOH), is requesting public comments on DRAFT PERMITS presently under review for the following affected facilities subject to greenhouse gas (GHG) emission reductions&#058;<\/p>\n<p>A. <\/font><font size=\"2\" color=\"#000000\"><u>Independent Power Producers (IPPs)<\/p>\n<p><\/u><\/font><font size=\"2\" color=\"#000000\"><b> (1) Amendment of Covered Source Permit (CSP) No. 0087-02-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0087-09<br \/>\n  AES Hawaii, LLC (AES) <br \/>\n  203 MW Coal-Fired Cogeneration Plant <br \/>\n  Located At&#058;  91-086 Kaomi Loop, Kapolei, Oahu<\/p>\n<p> <\/font><font size=\"2\" color=\"#000000\"><b>(2) Amendment of Covered Source Permit (CSP) No. 0243-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0243-07<br \/>\n  Hamakua Energy, LLC (Hamakua Energy)<br \/>\n  Hamakua Energy Plant (HEP)<br \/>\n  65 MW Cogeneration Facility<br \/>\n  Located At&#058;  45-300 Lehua Street, Honokaa, Hawaii<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (3) Amendment of Covered Source Permit (CSP) No. 0214-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0214-10<br \/>\n  Kalaeloa Partners, L.P. (KPLP) <br \/>\n  Kalaeloa Cogeneration Plant (KCP) <br \/>\n  223.5 MW Kalaeloa Cogeneration Plant<br \/>\n  Located At&#058;  91-111 Kalaeloa Boulevard, Kapolei, Oahu<\/p>\n<p>B. <\/font><font size=\"2\" color=\"#000000\"><u>Hawaiian Electric Companies<\/p>\n<p><\/u><\/font><font size=\"2\" color=\"#000000\"> <\/font><font size=\"2\" color=\"#000000\"><b>(1) Amendment of Covered Source Permit (CSP) No. 0548-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0548-09<br \/>\n  Hawaiian Electric Company, Inc. (HECO)<br \/>\n  Campbell Industrial Park (CIP) Generating Station<br \/>\n  Located At&#058;  91-196 Hanua Street, Kapolei, Oahu<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (2) Amendment of Covered Source Permit (CSP) No. 0240-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0240-08<br \/>\n  Hawaiian Electric Company, Inc. (HECO)<br \/>\n  Kahe Generating Station<br \/>\n  Located At&#058;  92-200 Farrington Highway, Waianae, Oahu<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (3) Amendment of Covered Source Permit (CSP) No. 0238-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0238-05<br \/>\n  Hawaiian Electric Company, Inc. (HECO)<br \/>\n  Honolulu Generating Station<br \/>\n  Located At&#058;  170 Ala Moana Boulevard, Honolulu, Oahu<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (4) Amendment of Covered Source Permit (CSP) No. 0239-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0239-06<br \/>\n  Hawaiian Electric Company, Inc. (HECO)<br \/>\n  Waiau Generating Station<br \/>\n  Located At&#058;  475 Kamehameha Highway, Pearl City, Oahu<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (5) Amendment of Covered Source Permit (CSP) No. 0234-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0234-05<br \/>\n  Hawaii Electric Light Company, Inc. (HELCO)<br \/>\n  Kanoelehua-Hill Generating Station<br \/>\n  Located At&#058;  54 Halekauila Street, Hilo, Hawaii<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (6) Amendment of Covered Source Permit (CSP) No. 0007-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0007-07 (0007-01-C)<br \/>\n  Application for Significant Modification No. 0070-04 (0070-01-C)<br \/>\n  Hawaii Electric Light Company, Inc. (HELCO)<br \/>\n  Keahole Generating Station<br \/>\n  Located At&#058;  73-4249 Pukiawe Street, Kailua Kona, Hawaii<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (7) Amendment of Covered Source Permit (CSP) No. 0235-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0235-04<br \/>\n  Hawaii Electric Light Company, Inc. (HELCO)<br \/>\n  Puna Generating Station<br \/>\n  Located At&#058;  Puna Mill Road, Keaau, Hawaii<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (8) Amendment of Covered Source Permit (CSP) No. 0232-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0232-06<br \/>\n  Maui Electric Company, Ltd. (MECO)<br \/>\n  Kahului Generating Station<br \/>\n  Located At&#058;  200 Hobron Avenue, Kahului, Maui<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (9) Amendment of Covered Source Permit (CSP) No. 0067-01-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0067-14 (0067-01-C)<br \/>\n  Application for Significant Modification No. 0067-15 (0067-02-C)<br \/>\n  Maui Electric Company, Ltd. (MECO)<br \/>\n  Maalaea Generating Station<br \/>\n  Located At&#058;  Maalaea Generating Station, Maalaea, Maui<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (10) Amendment of Covered Source Permit (CSP) No. 0031-04-C<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Application for Significant Modification No. 0031-08 <br \/>\n  Maui Electric Company, Ltd. (MECO)<br \/>\n  Palaau Generating Station<br \/>\n  Located At&#058;  32 Ulili Street, Kaunakakai, Molokai<\/p>\n<p>The <\/font><font size=\"2\" color=\"#000000\"><b>DRAFT PERMITS<\/b><\/font><font size=\"2\" color=\"#000000\"> are described as follows&#058;<\/p>\n<p>The permit amendments incorporate GHG emission caps in accordance with HAR Chapter 11-60.1, Subchapter 11, to limit GHG emissions from affected facilities.  Affected facilities are permitted covered sources with potential carbon dioxide equivalent (CO2e) emissions (biogenic plus nonbiogenic) equal to or greater than 100,000 short tons per year.  <\/p>\n<p>Pursuant to HAR Chapter 11-60.1, Subchapter 11, the amendments incorporate provisions for partnering between thirteen (13) electric plants to combine emissions for flexibility in achieving the GHG reductions. Three (3) affected facilities are independent power producers (IPPs) owned and operated by AES, Hamakua Energy, and KPLP.  The remaining ten (10) affected facilities are from the Hawaiian Electric Companies that include HECO, HELCO, and MECO.  <\/p>\n<p>The partnering facilities propose a total combined GHG emission baseline for establishing the facility-wide GHG emissions cap of 7,584,991 metric tons (8,361,022 short tons) per year.  Partnering facilities used 2010 as the baseline year, except for the KCP cogeneration plant which used 2009 for its baseline year because 2010 was deemed unrepresentative due to an overhaul of its steam turbine generator.  Emissions from HECO&#8217;s Shipman Generating Station which closed at the end of 2015 were included in the baseline emissions.  The total combined GHG emissions cap proposed for the partnering facilities for calendar year 2020 and beyond is 6,371,392 metric tons (7,023,257 short tons) of CO2e emissions per calendar year which is a 16% reduction from the proposed total combined GHG emission baseline level.  <\/p>\n<p>For calendar year 2019, cap adjustments are necessary to compensate for the continuing unavailability of renewable energy from Puna Geothermal Venture (PGV) and delays to new renewable energy projects for reasons outside of the control of the partnering facilities. The cap adjustments will temporarily increase the total combined GHG emissions cap proposed for the partnering facilities to 6,539,587 metric tons (7,208,661 short tons) for a 13.78% reduction from the proposed total combined GHG emission baseline level.  Alternate operating scenarios are added to the permits for continuing with the cap adjustments by adding one twelfth (1&#047;12) of the 2019 annual adjustments for every month that PGV generation is delayed into and beyond calendar year 2020.  The 2019 annual CO2e adjustments for each individual facility on the island of Hawaii only are 97,524 short tons for Hamakua Energy, LLC, 17,132 short tons for Kanoelehua-Hill Generating Station, 31,213 short tons for Keahole Generating Station, and 39,535 short tons for Puna Generating Station.  The total combined CO2e adjustment for these facilities is 185,404 short tons.  For delays in PGV generation into and beyond calendar year 2020, monthly adjustments for each individual facility on the island of Hawaii are 8,127 short tons for Hamakua Energy, LLC, 1,428 short tons for Kanoelehua-Hill Generating Station, 2,601 short tons for Keahole Generating Station, and 3,295 short tons for Puna Generating Station for a total monthly CO2e adjustment of 15,450 short tons.  These alternate operating scenarios apply to each individual cap for partnering facilities on the island of Hawaii and the total combined emissions cap for all partnering facilities until PGV restores net generation of electricity to levels that that preceded it&#8217;s shutdown due to the volcanic activity that was determined to be 26,883 MWh.  Once net generation of 26,883 MWh per month from the PGV facility is reached, the alternate operating scenarios no longer apply and no further adjustments will be made to the CO2e emissions caps, thereafter.<\/p>\n<p>For calendar year 2020 and beyond, AES further reduced its individual GHG emissions cap by 16% below its individual GHG emission baseline level.  Emissions from the AES cap adjustments were distributed evenly among partnering facilities on the island of Oahu, excluding the AES plant and the HECO Honolulu Generating Station.  <\/p>\n<p>The three (3) IPP permits and CSP No. 0548-01-C for HECO&#8217;s CIP Generating Station will specify individual and total combine GHG emission caps established for the partnering facilities.  Any GHG emission cap revision will require each of these facilities (AES, Hamakua Energy, KPLP, and HECO&#8217;s CIP Generating Station) to submit a significant permit modification for the change. <\/p>\n<p>The permits for the remaining partnering facilities operated by HECO, HELCO, and MECO will not specify individual and total combined GHG emission caps, but instead reference GHG emission caps included in CSP No. 0548-01-C for HECO&#8217;s CIP Generating Station.  Designating CSP No. 0548-01-C as the main permit will reduce the burden of modifying all Hawaiian Electric Companies&#8217; permits should an emissions cap be revised.  Only CSP No. 0548-01-C would require modification as the emission caps will not be incorporated separately into each facility&#8217;s permit.<\/p>\n<p>Individual and total combined GHG emission caps were established in each facility&#8217;s GHG emission reduction plan.  Each facility may exceed its individual cap as long as the total combined GHG emissions cap is met.  Biogenic carbon dioxide emissions are excluded in determining compliance with the CO2e emissions caps.<\/p>\n<p>A. <\/font><font size=\"2\" color=\"#000000\"><u>Independent Power Producers (IPPs)<\/p>\n<p><\/u><\/font><font size=\"2\" color=\"#000000\"> <\/font><font size=\"2\" color=\"#000000\"><b>(1)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0087-02-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 1,534,598 metric tons (1,691,605 short tons) for calendar year   2019 and 1,281,442 metric tons (1,412,548 short tons) for calendar   year 2020 and beyond that applies specifically to the AES cogeneration   plant.  The conditional approval includes temporarily increasing the   total combined CO2e emissions cap proposed in partnering with the   other affected facilities to 6,539,587 metric tons (7,208,661 short   tons) for calendar year 2019 and an alternate operating scenario that   adds one twelfth (1&#047;12) of the 2019 annual adjustments to the 2020   and beyond GHG emissions cap for every month that PGV&#8217;s restoration   is delayed into and beyond calendar year 2020.  A total combined   CO2e emissions cap of 6,371,392 metric tons (7,023,257 short tons)   is specified for calendar year 2020 and beyond. The alternate   operating scenarios will no longer apply once a net generation of   26,883 MWh per month from PGV is reached.  <\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (2)<\/b><\/font><font size=\"2\" color=\"#000000\">  The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0243-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to temporarily increase individual CO2e emissions   cap to 227,906 metric tons (251,223 short tons) for calendar year   2019 and an alternate operating scenario that adds one twelfth (1&#047;12)   of the 2019 annual adjustments to the 2020 and beyond GHG   emission cap for every month that PGV&#8217;s restoration is delayed into and   beyond calendar year 2020.  For 2020 and beyond, an individual CO2e   emissions cap of 139,433 metric tons (153,699 short tons) is   specified for the Hamakua Energy cogeneration plant.  The conditional   approval includes temporarily increasing the total combined CO2e   emission cap proposed in partnering with the other affected facilities to   6,539,587 metric tons (7,208,661 short tons) for calendar year 2019   and alternate operating scenario that adds one twelfth (1&#047;12) of the   2019 annual adjustments to the 2020 and beyond GHG emissions cap   for every month that PGV&#8217;s restoration is delayed into and beyond   calendar year 2020.  A total combined CO2e emissions cap of   6,371,392 metric tons (7,023,257 short tons is specified for calendar   year 2020 and beyond.  The alternate operating scenarios will no   longer apply once a net generation of 26,883 MWh per month from   PGV is reached.  <\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (3)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0214-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 993,198 metric tons (1,094,813 short tons) for calendar year 2019   and 1,056,486 metric tons (1,164,577 short tons) for calendar year   2020 and beyond that applies specifically to the KPLP cogeneration   plant.  The conditional approval includes temporarily increasing the   total combined CO2e emissions cap proposed in partnering with the   other affected facilities to 6,539,587 metric tons (7,208,661 short   tons) for calendar year 2019 and an alternate operating scenario that   adds one twelfth (1&#047;12) of the 2019 annual adjustments to the 2020   and beyond GHG emissions cap for every month that PGV&#8217;s restoration   is delayed into beyond calendar year 2020.  A total combined CO2e   emission cap of 6,371,392 metric tons (7,023,257 short tons) is   specified for calendar year 2020 and beyond.  The alternate operating   scenarios will no longer apply once a net generation of 26,883 MWh   per month from PGV is reached.  <\/p>\n<p>B. <\/font><font size=\"2\" color=\"#000000\"><u>Hawaiian Electric Companies<\/u><\/font><font size=\"2\" color=\"#000000\"> <\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (1)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0548-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 48,752 metric tons (53,740 short tons) for calendar year 2019 and   112,041 metric tons (123,504 short tons) for calendar year 2020 and   beyond that applies specifically to the HECO CIP Generating Station.    The conditional approval includes temporarily increasing the total   combined CO2e emissions cap proposed in partnering with the other   affected facilities to 6,539,587 metric tons (7,208,661 short tons) for   calendar year 2019 and an alternate operating scenario that adds one   twelfth (1&#047;12) of the 2019 annual adjustments to the 2020 and   beyond GHG emissions cap for every month that PGV&#8217;s restoration is   delayed into and beyond calendar year 2020.   A total combined CO2e   emission cap of 6,371,392 metric tons (7,023,257 short tons) is   specified for calendar year 2020 and beyond.  The alternate operating   scenarios will no longer apply once a net generation of 26,883 MWh   per month from PGV is reached.  <\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (2)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0238-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap 0   metric tons (0 short tons) per calendar year that applies specifically to   <\/font><font size=\"2\" color=\"#000000\">the HECO Honolulu Generating Station.  The conditional approval includes<\/font><font size=\"2\" color=\"#000000\">   temporarily increasing the total combined CO2e emissions cap   proposed in partnering with the other affected facilities to 6,539,587   metric tons (7,208,661 short tons) for calendar year 2019 and an   alternate operating scenario that adds one twelfth (1&#047;12) of the 2019   annual adjustments to the 2020 and beyond GHG emissions cap for   every month that PGV&#8217;s restoration is delayed into and beyond calendar   year 2020.  A total combined CO2e emission cap of 6,371,392 metric   tons (7,023,257 short tons) is specified for calendar year 2020 and   beyond.  The alternate operating scenarios will no longer apply once a   net generation of 26,883 MWh per month from PGV is reached.<br \/>\n<\/font><font size=\"2\" color=\"#000000\"><b> <br \/>\n (3)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0240-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   1,935,707 metric tons (2,133,752 short tons) for calendar year 2019   and 1,998,996 metric tons (2,203,516 short tons) for calendar year   2020 and beyond that applies specifically to the HECO Kahe   Generating Station.  The conditional approval includes temporarily   increasing the total combined CO2e emissions cap proposed in   partnering with the other affected facilities to 6,539,587 metric tons   (7,208,661 short tons) for calendar year 2019 and an alternate   operating scenario that adds one twelfth (1&#047;12) of the 2019 annual   adjustments to the 2020 and beyond GHG emissions cap for every   month that PGV&#8217;s restoration is delayed into and beyond calendar year   2020.  A total combined CO2e emission cap of 6,371,392 metric tons   (7,023,257 short tons) is specified for calendar year 2020 and   beyond.  The alternate operating scenarios will no longer apply once a   net generation of 26,883 MWh per month from PGV is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (4)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0239-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 733,265 metric tons (808,286 short tons) for calendar year 2019   and 796,554 metric tons (878,050 short tons) for calendar year 2020   and beyond that applies specifically to the HECO Waiau Generating   Station.  The conditional approval includes temporarily increasing the   total combined CO2e emissions cap proposed in partnering with the   other affected facilities to 6,539,587 metric tons (7,208,661 short   tons) for calendar year 2019 and an alternate operating scenario that   adds one twelfth (1&#047;12) of the 2019 annual adjustments to the 2020   and beyond GHG emissions cap for every month that PGV&#8217;s restoration   is delayed beyond into and beyond calendar year 2020 to a total   combined CO2e emission cap of 6,371,392 metric tons (7,023,257   short tons) in partnering with all other affected facilities.  The alternate   operating scenarios will no longer apply once a net generation of   26,883 MWh per month from PGV is reached.<\/p>\n<p>  <\/font><font size=\"2\" color=\"#000000\"><b>(5) <\/b><\/font><font size=\"2\" color=\"#000000\">  The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0234-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to temporarily increase the individual CO2e   emissions cap to 171,991 metric tons (189,588 short tons) for   calendar year 2019 and an alternate operating scenario that adds one   twelfth (1&#047;12) of the 2019 annual adjustments to the 2020 and   beyond GHG emissions cap for every month that PGV&#8217;s restoration is   delayed into and beyond calendar year 2020.  For calendar year 2020   and beyond, an individual CO2e emissions cap of 156,449 metric tons   (172,456 short tons) per calendar year is specified for the HELCO   Kanoelehua-Hill Generating Station.  The conditional approval includes   temporarily increasing the total combined CO2e emissions cap   proposed in partnering with the other affected facilities to 6,539,587   metric tons (7,208,661 short tons) for calendar year 2019 and an   alternate operating scenario that adds one twelfth (1&#047;12) of the 2019   annual adjustments to the 2020 and beyond GHG emission cap for   every month that PGV&#8217;s restoration is delayed into and beyond calendar   year 2020.  A total combined CO2e emission cap of 6,371,392 metric   tons (7,023,257 short tons) is specified for calendar year 2020 and   beyond.  The alternate operating scenarios will no longer apply once   PGV net generation of 26,883 MWh per month is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (6) <\/b><\/font><font size=\"2\" color=\"#000000\">  The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0007-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to temporarily increase the individual CO2e   emissions cap to 248,043 metric tons (273,421 short tons) for   calendar year 2019 and an alternate operating scenario that adds one   twelfth (1&#047;12) of the 2019 annual adjustments to the 2020 and   beyond GHG emissions cap for every month that PGV&#8217;s restoration is   delayed into and beyond calendar year 2020.   For calendar year 2020   and beyond, an individual CO2e emissions cap of 219,727 metric tons   (242,208 short tons) per calendar year is specified for the HELCO   Keahole Generating Station.  The conditional approval includes   temporarily increasing the total combined CO2e emissions cap   proposed in partnering with the other affected facilities to 6,539,587   metric tons (7,208,661 short tons) for calendar year 2019 and an   alternate operating scenario that adds one twelfth (1&#047;12) of the 2019   annual adjustments to the 2020 and beyond GHG emissions cap for   every month that PGV&#8217;s restoration is delayed  into and beyond   calendar year 2020.  A total combined CO2e emission cap of   6,371,392 metric tons (7,023,257 short tons) is specified for calendar   year 2020 and beyond.  The alternate operating scenarios will no   longer apply once a net generation of 26,883 MWh per month from   PGV is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (7)<\/b><\/font><font size=\"2\" color=\"#000000\"> The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0235-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to temporarily increase the individual CO2e   emissions cap to 64,666 metric tons (71,282 short tons) for calendar   year 2019 and an alternate operating scenario that adds one twelfth   (1&#047;12) of the 2019 annual adjustments to the 2020 and beyond GHG   emissions cap for every month that PGV&#8217;s restoration is delayed into   and beyond calendar year 2020.  For calendar year 2020 and beyond   an individual CO2e emissions cap of 28,800 metric tons (31,747 short   tons) per calendar year for the HELCO Puna Generating Station.  The   conditional approval includes temporarily increasing the total combined   CO2e emissions cap proposed in partnering with the other affected   facilities to 6,539,587 metric tons (7,208,661 short tons) for calendar   year 2019 and an alternate operating scenario that adds one twelfth   (1&#047;12) of the 2019 annual adjustments to the 2020 and beyond GHG   emissions cap for every month that PGV&#8217;s restoration is delayed into   and beyond calendar year 2020.  A total combined CO2e emission cap   of 6,371,392 metric tons (7,023,257 short tons) is specified for   calendar year 2020 and beyond.  The alternate operating scenarios will   no longer apply once a net generation of 26,883 MWh per month from   PGV is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (8) <\/b><\/font><font size=\"2\" color=\"#000000\">  The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0232-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 140,281 metric tons (154,633 short tons) per calendar year that   applies specifically to the MECO Kahului Generating Station.  The   conditional approval includes temporarily increasing the total combined   CO2e emissions cap proposed in partnering with the other affected   facilities to 6,539,587 metric tons (7,208,661 short tons) for calendar   year 2019 and an alternate operating scenario that adds one twelfth   (1&#047;12) of the 2019 annual adjustments to the 2020 and beyond GHG   emissions cap for every month that PGV&#8217;s restoration is delayed into   and beyond calendar year 2020.  A total combined CO2e emission cap   of 6,371,392 metric tons (7,023,257 short tons) is specified for   calendar year 2020 and beyond.  The alternate operating scenarios will   no longer apply once a net generation of 26,883 MWh per month from   PGV is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (9)<\/b><\/font><font size=\"2\" color=\"#000000\">   The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0067-01-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 417,182 metric tons (459,864 short tons) per calendar year that   applies specifically to the MECO Maalaea Generating Station.  The   conditional approval includes temporarily increasing the total combined   CO2e emissions cap proposed in partnering with the other affected   facilities to 6,539,587 metric tons (7,208,661 short tons) for calendar   year 2019 and an alternate operating scenario that adds one twelfth   (1&#047;12) of the 2019 annual adjustments to the 2020 and beyond GHG   emissions cap for every month that PGV&#8217;s restoration is delayed into   and beyond calendar year 2020.  A total combined CO2e emission cap   of 6,371,392 metric tons (7,023,257 short tons) is specified for   calendar year 2020 and beyond.  The alternate operating scenarios will   no longer apply once PGV net generation of 26,883 MWh per month is   reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b> (10)<\/b><\/font><font size=\"2\" color=\"#000000\">  The significant modification of <\/font><font size=\"2\" color=\"#000000\"><b>CSP No. 0031-04-C<\/b><\/font><font size=\"2\" color=\"#000000\"> will grant   conditional approval to incorporate an individual CO2e emissions cap   of 23,999 metric tons (26,454 short tons) per calendar year that   applies specifically to the MECO Palaau Generating Station. The   conditional approval includes temporarily increasing the total combined   CO2e emissions cap proposed in partnering with the other affected   facilities to 6,539,587 metric tons (7,208,661 short tons) for calendar   year 2019 and an alternate operating scenario that adds one twelfth   (1&#047;12) of the 2019 annual adjustments to the 2020 and beyond GHG   emissions cap for every month that PGV&#8217;s restoration is delayed into   and beyond calendar year 2020.  A total combined CO2e emission cap   of 6,371,392 metric tons (7,023,257 short tons) is specified for   calendar year 2020 and beyond.  The alternate operating scenarios will   no longer apply once a net generation of 26,883 MWh per month from   PGV is reached.<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\">The <\/font><font size=\"2\" color=\"#000000\"><b>ADMINISTRATIVE RECORDS<\/b><\/font><font size=\"2\" color=\"#000000\">, consisting of the <\/font><font size=\"2\" color=\"#000000\"><b>APPLICATIONS, GHG EMISSION<\/font><font size=\"2\" color=\"#000000\"><b> REDUCTION PLANS<\/b><\/font><font size=\"2\" color=\"#000000\">, and non-confidential supporting material from the applicant, the permit review summary, and the <\/font><font size=\"2\" color=\"#000000\"><b>DRAFT PERMITS<\/b><\/font><font size=\"2\" color=\"#000000\">, are available for public inspection during regular office hours, Monday through Friday, 7&#058;45 a.m. to 4&#058;15 p.m., at the following locations&#058;<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b>Oahu&#058;<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  State of Hawaii<br \/>\n  Clean Air Branch<br \/>\n  2827 Waimano Home Road, &#035;130<br \/>\n  Pearl City, HI  96782<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b>Hawaii&#058;<br \/>\n<\/b><\/font><font size=\"2\" color=\"#000000\">  Hilo&#058; Hawaii District Health Office, Department of Health<br \/>\n   1582 Kamehameha Avenue, Hilo, Hawaii  96720<\/p>\n<p>  Kona&#058; Sanitation Branch, Department of Health<br \/>\n   79-1020 Haukapila Street, Room 115, Kona, Hawaii  96750<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b>Maui&#058;<\/b><\/font><font size=\"2\" color=\"#000000\"> <br \/>\n  Maui District Health Office, Department of Health<br \/>\n  54 High Street, Wailuku, Maui  96793<\/p>\n<p><\/font><font size=\"2\" color=\"#000000\"><b>Kauai&#058;<\/b><\/font><font size=\"2\" color=\"#000000\"> <br \/>\n  Kauai District Health Office, Department of Health<br \/>\n  3040 Umi Street, Lihue, Kauai  96766<\/p>\n<p>All comments on the draft permits and any request for a public hearing must be in writing, addressed to the Clean Air Branch at the above address on Oahu and must be postmarked or received by <\/font><font size=\"2\" color=\"#000000\"><b>August 14, 2020<\/b><\/font><font size=\"2\" color=\"#000000\">.<\/p>\n<p>Any person may request a public hearing by submitting a written request that explains the party&#8217;s interest and the reasons why a hearing is warranted.  The DOH may hold a public hearing if a hearing would aid in DOH&#8217;s decision.  If a public hearing is warranted, a public notice for the hearing will be published at least thirty (30) days in advance of the hearing.<\/p>\n<p>Interested persons may obtain copies of the administrative record or parts thereof by paying <\/font><font size=\"2\" color=\"#000000\"><b><u>five (5) cents per page copying costs<\/b><\/u><\/font><font size=\"2\" color=\"#000000\">.  Please send written requests to the Oahu office of the Clean Air Branch listed above or call Mr. Dale Hamamoto (CSPs for Hamakua Energy and KPLP facilities) or Mr. Michael Madsen (CSPs for AES, HECO, HELCO, and MECO facilities) at the Clean Air Branch office at (808) <\/font><font size=\"2\" color=\"#000000\">586-4200.  Electronic copies of the draft permits, permit reviews, and GHG emission<\/font><font size=\"2\" color=\"#000000\"> reduction plans may be found online at <\/font><font size=\"2\" color=\"#000000\"><u>http&#058;&#047;&#047;health.hawaii.gov&#047;cab&#047;public-notices&#047;<\/u><\/font><font size=\"2\" color=\"#000000\">.<\/p>\n<p>Comments on the draft permits should address, but need not be limited to, the permit conditions and the facility&#8217;s compliance with federal and state air pollution laws, including&#058;  (1) the National and State Ambient Air Quality Standards; and (2) HRS, Chapter 342B and HAR, Chapter 11-60.1.<\/p>\n<p>DOH will make a final decision on the permits after considering all comments and will send notice of the final decision to each person who has submitted comments or requested such notice.<\/p>\n<p>    Bruce S. Anderson, Ph.D.<br \/>\n    Director of Health<br \/>\n(TGI1287136      7&#047;14&#047;20)<\/font><\/p>\n","protected":false},"excerpt":{"rendered":"<p>REQUEST FOR PUBLIC COMMENTS ON DRAFT AIR PERMITS REGULATING THE EMISSIONS OF AIR POLLUTANTS (Docket No. 20-CA-PA-06) Pursuant to Hawaii Revised Statutes (HRS), Chapter 342B-13, and Hawaii Administrative Rules (HAR), Chapter 11-60.1, the Department of Health, State of Hawaii (DOH), is requesting public comments on DRAFT PERMITS presently under review for the following affected facilities [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[252],"tags":[],"class_list":["post-2835","post","type-post","status-publish","format-standard","hentry","category-public-notices-state-legals-public-notices"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>0001287136-01 - The Garden Island Classifieds<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"0001287136-01 - The Garden Island Classifieds\" \/>\n<meta property=\"og:description\" content=\"REQUEST FOR PUBLIC COMMENTS ON DRAFT AIR PERMITS REGULATING THE EMISSIONS OF AIR POLLUTANTS (Docket No. 20-CA-PA-06) Pursuant to Hawaii Revised Statutes (HRS), Chapter 342B-13, and Hawaii Administrative Rules (HAR), Chapter 11-60.1, the Department of Health, State of Hawaii (DOH), is requesting public comments on DRAFT PERMITS presently under review for the following affected facilities [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/\" \/>\n<meta property=\"og:site_name\" content=\"The Garden Island Classifieds\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-14T03:15:01+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"0001287136-01\",\"datePublished\":\"2020-07-14T03:15:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/\"},\"wordCount\":3726,\"articleSection\":[\"Public Notices\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/\",\"url\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/\",\"name\":\"0001287136-01 - The Garden Island Classifieds\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/#website\"},\"datePublished\":\"2020-07-14T03:15:01+00:00\",\"author\":{\"@id\":\"\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/state-legals\\\/public-notices-state-legals-public-notices\\\/0001287136-01\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"0001287136-01\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/#website\",\"url\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/\",\"name\":\"The Garden Island Classifieds\",\"description\":\"Advertise on Kauai&#039;s best-read news website\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hawaii.carpentermediagroup.com\\\/tgiclassifieds\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"0001287136-01 - The Garden Island Classifieds","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/","og_locale":"en_US","og_type":"article","og_title":"0001287136-01 - The Garden Island Classifieds","og_description":"REQUEST FOR PUBLIC COMMENTS ON DRAFT AIR PERMITS REGULATING THE EMISSIONS OF AIR POLLUTANTS (Docket No. 20-CA-PA-06) Pursuant to Hawaii Revised Statutes (HRS), Chapter 342B-13, and Hawaii Administrative Rules (HAR), Chapter 11-60.1, the Department of Health, State of Hawaii (DOH), is requesting public comments on DRAFT PERMITS presently under review for the following affected facilities [&hellip;]","og_url":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/","og_site_name":"The Garden Island Classifieds","article_published_time":"2020-07-14T03:15:01+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/#article","isPartOf":{"@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/"},"author":{"name":"","@id":""},"headline":"0001287136-01","datePublished":"2020-07-14T03:15:01+00:00","mainEntityOfPage":{"@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/"},"wordCount":3726,"articleSection":["Public Notices"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/","url":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/","name":"0001287136-01 - The Garden Island Classifieds","isPartOf":{"@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/#website"},"datePublished":"2020-07-14T03:15:01+00:00","author":{"@id":""},"breadcrumb":{"@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/state-legals\/public-notices-state-legals-public-notices\/0001287136-01\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/"},{"@type":"ListItem","position":2,"name":"0001287136-01"}]},{"@type":"WebSite","@id":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/#website","url":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/","name":"The Garden Island Classifieds","description":"Advertise on Kauai&#039;s best-read news website","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/posts\/2835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/comments?post=2835"}],"version-history":[{"count":0,"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/posts\/2835\/revisions"}],"wp:attachment":[{"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/media?parent=2835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/categories?post=2835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hawaii.carpentermediagroup.com\/tgiclassifieds\/wp-json\/wp\/v2\/tags?post=2835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}